Skip to main content
300+ 5-star reviews. · One-hour appointment windows · Upfront pricing
Stone Electric · Remodels, Additions & New Loads

Electrical Wiring for Remodels & Additions

★★★★★Google · 300+ 5-star reviews

Kitchen remodel, finished basement, addition, workshop or new construction? We plan circuits, wiring, device locations and capacity before the walls close, then give you upfront pricing for the electrical work.

Same-Day Service
1-Hour Windows
Upfront Pricing

Licensed & insured · Certified electricians · Required permits & inspections handled

Project-first planningCircuits, devices, lighting and loads planned together
Rough-in through finishElectrical work sequenced around the project
100% Satisfaction GuaranteePlus lifetime craftsmanship guarantee
Permits handledRequired permits & inspections fully handled and included

Residential remodel electrical

Plan the electrical before drywall makes every change harder.

Remodel wiring is not just “add some outlets.” The useful plan starts with how the finished space will be used, what equipment it must support, where lighting and controls belong, and whether the existing panel and circuits can support the project.

Kitchen remodels

Plan appliance circuits, countertop receptacles, lighting, controls and any panel/capacity implications together.

Finished basements

Plan receptacles, lighting, smoke/CO electrical work, dedicated loads and future-use needs before walls close.

Room additions

New spaces can require added circuits, device locations, lighting and a review of available service capacity.

Bathrooms & laundry

Equipment, receptacle protection, lighting and dedicated-load requirements should be planned from the actual fixtures and appliances.

Garage & workshops

Plan workbench receptacles, lighting and equipment circuits around what you will actually use.

New construction

Electrical layout, circuit planning and rough-in should match room use, equipment and future loads rather than be decided after finishes.

What to expect

From room plan to final electrical checks.

01 · PLAN

Define rooms, equipment and loads.

We plan circuit layout around room use, equipment, expected loads and the finished-space design before rough-in.

02 · VERIFY

Check existing wiring and capacity.

We evaluate the existing system, circuit needs, wiring routes and panel implications before approving the work.

03 · ROUGH-IN

Install wiring before finishes close.

boxes, circuits and wiring are installed at the appropriate project stage, with required inspections handled.

04 · FINISH

Complete devices, fixtures and testing.

We complete the trim-out work and verify the finished electrical installation.

Wiring work

Targeted project wiring is not the same as whole-house rewiring.

A remodel may need new circuits only in the rooms being changed. An addition may need new wiring plus a capacity review. A damaged existing circuit may need repair before the remodel proceeds. We separate those conditions so the project does not automatically become a whole-home rewiring job.

If your concern is existing wiring throughout an older Castle Rock home rather than a remodel or addition, start with Stone’s Castle Rock electrician service.

Related electrical services

Use the service that matches the project.

Need a specific appliance or 240V circuit? Use dedicated circuit installation.

Need more service capacity or panel replacement? Use panel and breaker service, or the local panel service for your area.

Need EV charging? Use EV charger installation.

Plan with the finished space in mind

Outlet, switch and lighting locations should follow how the room will actually work.

Furniture, counters, work areas, appliances, charging needs and lighting zones all affect useful device placement. Planning them before rough-in reduces avoidable changes later.

  • Equipment and appliance models when known
  • Desired lighting and switching zones
  • Workstation, TV and charging locations
  • Future loads you already expect to add
Stone electricians planning a residential electrical project
Project use, equipment and existing capacity shape the electrical plan.

Remodel wiring across the Denver metro

Remodel and addition electrical work across Stone’s Denver-metro markets.

We handle residential remodel and upgrade projects across its Denver-metro service area.

Castle Rock · Castle Pines · Parker · Highlands Ranch · Lone Tree · Centennial · Littleton · Greenwood Village · Englewood · Denver · Lakewood · Golden · Wheat Ridge · Arvada

Remodel wiring questions

Questions before the project starts?

Does a remodel always require rewiring?

No. The required electrical work depends on what the project changes, the existing wiring and the new loads being added. Stone defines the project from those facts.

When should the electrician be involved in a remodel?

Before walls and finishes close. Early electrical planning makes it easier to place circuits, devices, lighting and equipment connections where the finished project needs them.

Can Stone wire a finished basement or addition?

Yes. We handle residential circuit, device, lighting and related wiring work for finished spaces and additions within the project work.

Will the project require a panel upgrade?

Not automatically. We evaluate the existing panel, service capacity and proposed loads before recommending panel or service work.

Does Stone handle permits and inspections?

Yes. Required permits and inspections for our electrical work are fully handled and included.

Can I call Stone 24/7?

Yes. Call Stone 24/7, and a real person answers.

300+ 5-star reviews · Call 24/7

Plan the circuits before the walls close.